FROM THE WISCONSIN DEPARTMENT OF TRANSPORTATION
The Wisconsin Department of Transportation (WisDOT) North Central Region provides weekly road construction updates for the following counties in North Central Wisconsin: Adams, Green Lake, Florence, Forest, Iron, Langlade, Lincoln, Marathon, Marquette, Menominee, Oneida, Portage, Price, Shawano, Vilas, Waupaca, Waushara, and Wood.
This update can be found at https://projects.511wi.gov/region/north-central/.
Note: Regionwide projects are designed to complete similar work types at multiple locations in multiple counties. Due to the multiple locations and variety of times work is to be performed, detailed information on those projects are posted here: https://projects.511wi.gov/region-wide-nc/.
Adams and Wood Counties
Highway: WIS 13, WIS 21
Location: From WIS 21 to Pixler Court; Bridges over Carter Creek and Big Roche a Cri
Project ID: 6140-01-63/64/73
Schedule: August 10, 2020 to October 28, 2020
Cost: $3,766,727
Project description: This project consists of milling and overlaying 19 miles of WIS 13 from WIS 21 to Pixler Court. New pavement markings and aggregate shoulders will also be installed as part of the project. Additionally, polymer overlays will be installed on the bridges at Carter Creek (WIS 21) and Big Roche a Cri (WIS 13).
October 5 to October 9: Crews plan to mill the northbound lane of WIS 13 from 14 Mile Creek bridge to WIS 21, including all side roads on the east side of WIS 13. Crews plan to pave the northbound lane of WIS 13 from 14 Mile Creek bridge to WIS 21, including side roads on the east side of WIS 13.
Traffic Impacts: A lane closure with flagging can be expected on WIS 13. This closure will be a moving closure during paving operations.
Project website: https://projects.511wi.gov/wis13wa/
Highway: WIS 73
Location: County F to Deer Ridge Road
Project ID: 6320-00-62/74
Schedule: September 8, 2020 to October 20, 2020
Cost: $1,356,521
Project description: Work will consist of removing and replacing the pavement, grading, culvert pipe maintenance and/or replacement, and pavement markings.
October 5 to October 9: Crews will remove concrete barrier from culvert replacement work area near 90th Street South. Crews will remove a lane shift along the south side of WIS 73 and finish culvert work in the same area. Crews will then begin milling and paving operations on both lanes starting from County F and working west.
Traffic Impacts: WIS 73 will be reduced to a one lane road utilizing temporary traffic signals from 1000 feet west of 90th Street South to 100 feet west of 90th Street South.
Adams County
Highway: WIS 82
Location: County B to the Marquette County line
Project ID: 1430-01-87
Schedule: August 3, 2020 to November 2020
Cost: $4,868,453
October 5 to October 9: Crews will be in the area conducting excavation operations and will likely be working 24 hours a day, Monday through Saturday, for the next three weeks. Crews will be using heavy equipment and trucks beginning at the Marquette-Adams County line heading west. A separate crew will begin at County G North and work west.
Traffic impacts: WIS 82 was closed on August 3. Local traffic and EMS access will be maintained minimum 10’ wide lane for the duration of the project. The detour for non-local traffic is 36 miles.
Website: https://projects.511wi.gov/wis82-cth-b-marquette/
Highway: WIS 21
Location: Wisconsin River Bridge, between Necedah and Coloma at the Juneau County Line
Project ID: 6160-00-61
Schedule: September 10, 2020 to September 30, 2020
Cost: $360,076
Project description: Crews will be painting the steel girders that support the bridge.
October 5 to October 9: Crews will complete painting girders, remove the containment system, clean up staging areas and remove traffic control.
Traffic Impacts: Traffic will be maintained on a single lane across the bridge with temporary traffic signals managing traffic flow.
Website: https://projects.511wi.gov/wis21adams/
Florence County
Highway: WIS 139
Location: Fay Lake Road to Michigan State Line
Project ID: 9110-10-60/70
Schedule: October 5, 2020 to November 6, 2020; May 2021-July 2021
Cost: $2,467,350
Project description: This project will be divided between two construction seasons.
During the fall of 2020: Culvert replacement and asphaltic surface patching will occur. In the spring of 2021; a mill and overlay of the pavement, shoulder work and pavement markings will be installed.
October 5 to October 9: Traffic and erosion control devices will be installed along with construction staking. Culvert pipe installation will begin.
Traffic impacts: WIS 139 will remain open to traffic. Motorists can expect to encounter flagging operations and daytime temporary lane shifts will be in use.
Highway: WIS 101, WIS 139
Location: WIS 101 Bridge over Popple River; WIS 139 Bridge over Pine River
Project ID: 1009-47-60 & 9110-10-61
Schedule: August 31, 2020 to October 22, 2020
Cost: $705,623
Project description:
October 5 to October 9:
Traffic impacts:
Forest County
Highway: WIS 32
Location: East 6th Street to Linneman Lane; Crandon to Argonne
Project ID: 9260-01-62
Schedule: September 8, 2020 to October 2, 2020
Cost: $399,747
Project description: There are five culverts being replaced at four locations between the project limits.
Traffic impacts: On Friday, October 2, crews plan to remove the detour route and open WIS 32 to traffic.
Iron County
Highway: US 2
Location: West of Saxon, between Curry Road and Clement Road
Project ID: 1009-44-60
Schedule: July 9, 2020 to early October 2020
Cost: $879,203
Project description: The project consists of grading work to stabilize slopes at three culvert locations with drainage trenches along the shoulder at two of the locations to help prevent sloughing. There are three culverts located west of Saxon on US 2 between Curry Rd and Clement Road. Culvert work consists of two pipes receiving a liner and the third pipe being abandoned in place with a new pipe installed next to the existing. Riprap will be placed at the pipe ends and along the slopes to help stabilize and prevent erosion. All graded/disturbed areas will be restored when completed.
October 5 to October 9: Crews will continue restoring the south and north slopes. Weather permitting, work could be completed by October 9, 2020.
Traffic impacts: The project is anticipated to be constructed with minimal disruptions to traffic. Shoulder closures will be in-place for the duration of the project. Single-lane closures with flagging for short durations will be allowed to load, unload and move equipment and materials.
Langlade County
Highway: US 45
Locations: County J (east) to Clinic Street, and Otter Lake Lane to Oneida County Line, north and south of Elcho
Project ID: 1602-10-63
Schedule: August 10, 2020 to October 5, 2020
Cost: $2,126,391
Project description: Crews will replace culverts, curb & gutter and guardrail. US 45 will have the existing asphalt surface removed and a new asphalt surface paved over it with widened asphalt shoulders and new pavement markings.
October 5 to October 9: Crews will complete placement of new shoulder gravel and complete pavement markings. Work will begin on new thermoplastic snowmobile crossings.
Traffic impacts: Flagging operations will restrict traffic to one lane during construction.
Lincoln County
Highway: WIS 64
Location: Pine River Bridge
Project ID: 9000-04-70
Schedule: June 8, 2020 to November 2020
Cost: $1,397,335
Project description: The bridge over the Pine River will be demolished and reconstructed.
October 5 to October 12: Crews will work on areas around the bridge, apply a protective surface treatment and sealer to the bridge deck and walls. Crews plan to pour bridge approach slabs and place asphalt pavement.
Traffic impacts: WIS 64 mainline remains closed at the bridge. WIS 64 will still be available to traveling public as traffic has been switched from WIS 64 to a temporary, signalized bypass.
Website: https://projects.511wi.gov/wis64-merrill-antigo/
Marathon County
Highway: Business 51
Location: Everest Drive to Schofield Avenue; East Grand Avenue to Eau Claire River Bridge
Project ID: 6999-10-60/61
Schedule: September 30, 2020 to October 31, 2020
Cost: $1,056,821
October 5 to October 9: Crews will saw cut in preparation of inlet repairs in select locations and begin removal and replacement of curb and gutter at the same locations. Crews will install message boards on the eastbound and westbound WIS 29 ramps for Business 51 starting as early as October 7.
Traffic impacts: Business 51 has single lane closures in the northbound and southbound lanes. Traffic is shifted into the inside median lanes. All southbound lanes will be open between Jelinek Avenue and Everest Drive between 3 p.m. and 6 p.m. During the single lane closures, a 10-foot width restriction applies. During the week of October 12, for two nights, the eastbound and westbound WIS 29 ramps will be closed between the hours of 9 p.m. and 6 a.m. Message boards will be installed on the ramps as early as October 7 to provide notification of the closure times.
Website: https://projects.511wi.gov/bus51marathon/
Highway: WIS 153
Location: Old Highway 51 to East View Drive; Northbound and Southbound I-39 ramps at WIS 153; Mosinee
Project ID: 6600-00-61/62
Schedule: September 14, 2020 to June 2021
Cost: $1,619,346
Project description: Work in Fall 2020 will include reconstructing sidewalk curb ramps and installing traffic signal loop detectors. Asphalt paving and interchange ramp work will occur in Spring of 2021.
October 2 to October 9: Crews will complete installation of new loop detectors and pour in patching to fill those locations on WIS 153. Crews will continue to restore areas around each of the newly installed pedestrian ramps and sidewalk segments. Crews will remove traffic control and reopen the roadway to all lanes.
Traffic impacts: WIS 153 has a single lane closure in the westbound and eastbound lanes. Traffic is shifted into the outside lanes. The lane closures will be removed as early as Friday, October 2.
Website: https://projects.511wi.gov/wis153marathon/
Marquette County
Highway: WIS 23
Location: Mecan River Bridge
Schedule: June 29, 2020 to October 23, 2020
Cost: $992,457
October 5 to October 9: Crews will continue work on the bridge deck and bridge walls.
Traffic Impacts: Traffic will be controlled by temporary signals that will direct the traffic to one lane while crossing the bridge.
Website: https://projects.511wi.gov/wis23mecanbridge/
Menominee County
Highway: WIS 47
Location: Duquaine Road (BIA 334) to North Junction County VV
Project ID: 9650-17-61/70
Schedule: September 21, 2020 to Mid-November 2020; Spring 2021 to November 2021
Cost: $6,028,729
Length of project: 2.6 miles
Description of work: This is a resurfacing project on WIS 47. The project also includes roadway widening for bicycle lanes, new storm sewer and curb and gutter, reconstructing sidewalk and curb ramps to meet current Americans with Disabilities Act (ADA) requirements and a rehabilitation of the bridge deck surface over the Wolf River.
October 5 to October 9: Crews will continue construction of the new box culvert near County VV south junction below the WIS 47 southbound lanes.
Current traffic impacts: County VV (south junction) will be closed at WIS 47 with a detour utilizing Go Around Road until mid-November. WIS 47 will be reduced to a single lane with flagging and temporary traffic signals between Tribal Office Loop (north) and Fairgrounds Road.
Overall traffic impacts:
Website: https://projects.511wi.gov/wis47menominee/
Oneida and Vilas Counties
Highway: WIS 17
Location: Pollyanna Road to WIS 70
Project ID: 9040-02-61/62
Schedule: September 21, 2020 to October 23, 2020 and June 2021 to July 2021
Cost: $3,321,165
Description: The project consists of 21 culvert replacements, curb & gutter replacements, milling, and an asphalt pavement overlay. The contractor plans to install all culverts in Fall 2020, shut down for winter, and then complete the curb & gutter and paving in June and July 2021.
October 5 to October 9: Crews will work on culvert pipe replacements, patching at replacement locations and restoration work.
Traffic impacts: Traffic will be reduced to a single lane by flagging for culvert pipe and asphalt patching operations.
Overall traffic impacts: Traffic will be reduced to a single lane by flagging during culvert replacements, curb & gutter replacements, milling, and paving operations. Traffic may travel on a gravel surface during culvert replacements for a short duration. No work is allowed during the following holiday timeframes for this project:
Oneida County
Highway: US 51
Location: Oneida Street to Manitou Park Drive, Minocqua
Project ID: 1170-19-74
Schedule: October 5, 2020 to October 16, 2020
Cost: $ 1,213,982
Project Description: Crews will mill and overlay 2-inches of hot-mix-asphalt (HMA) pavement on 4.68 miles of US 51 from Oneida Street to Manitou Park Drive in Oneida County. Additional work will include pavement marking replacement.
October 5 to October 9: Crews will set up traffic control, mill and pave a test strip and mainline milling and paving.
Traffic impacts: US 51 will be down to one lane of traffic in each direction. Driveway access will be maintained throughout the entire construction project, except when work operations are performing directly in front of or adjacent to the driveways. Access will be maintained for businesses.
Highway: WIS 47
Location: US 8 to Kildeer Road
Project ID: 9050-03-70
Schedule: July 27, 2020 to early October 2020
Cost: $2,450,403
October 5 to October 9: Crews will be in the area working on punch list items.
Traffic impacts: The work zone is open to traffic, but crews will be in the area working on punch list items.
Website: https://projects.511wi.gov/wis47oneida/
Highway: US 8
Location: Bridge over the North Branch Pelican River, between Haymeadow Road and Berquist Road (Between Rhinelander and Monico)
Project ID: 1009-46-61
Schedule: September 8, 2020 for 55 working days. Crews will install a polymer overlay in Spring 2021.
Cost: $344,892
Description: This project consists of removing 1.5 inches of the concrete bridge deck and replacing with new concrete and bridge approaches.
October 5 to October 9: Crews will pour the bridge deck overlay, cure the bridge deck and remove approach slabs.
Traffic impacts: US 8 traffic restricted to a single lane with temporary signals. Traffic will utilize the eastbound lane through the work zone. US 8 traffic will maintain a minimum 12-foot-wide lane during construction.
Highway: US 51
Location: South Blue Lake Road to Oneida Street
Project ID: 1170-16-61
Schedule: August 17, 2020 to September 28, 2020
Length of project: 2.5 miles
Cost: $865,849
Description: The project entails one culvert replacement, slope grading, beam guard replacement at Lake Katherine, milling, and an asphalt pavement overlay.
October 5 to October 9: Crews will place pavement markings.
Traffic impacts: Traffic will be reduced to single lane by flagging for pavement marking operations.
Price County
Highway: US 8
Location: Bridges over Hay Creek, Wisconsin Central Limited Railroad, and South Fork Jump River
Schedule: February 24, 2020 to October 30, 2020
October 5 to October 9: Crews have prepared the Hay Creek bridge for forming and pouring concrete.
Traffic impacts: Westbound US 8 will add a right shoulder closure from Hay Creek to Beaumont Road, from August 6, 2020 until October 9, 2020. Motorists should anticipate activity with the contractor loading and unloading materials and equipment off the shoulder.
Website: https://projects.511wi.gov/us8price/
Shawano County
Highway: WIS 22
Location: Waupaca County line to County CCC
Project ID: 6251-11-70
Schedule: September 21, 2020 to November 2020
Cost: $1.8 Million
Length of project: 7.2 miles
Description of work: This project is a rehabilitation of WIS 22. Work consists of removing and replacing the asphalt surface, guardrail, storm sewer and pavement markings.
October 5 to October 9: Crews will complete milling operations and will continue paving operations on WIS 22 from County CC to Lake Wagner Road.
Traffic Impacts: WIS 22 will be reduced to one lane with traffic controlled by flaggers during daylight hours.
Highway: WIS 22
Location: Culvert is located between Lakeview Drive and Oakcrest Drive
Project ID: 9180-17-60
Schedule: September 14, 2020 to November 2020
Cost: $521,000
Project description: Crews will be removing the existing box culvert and replacing with a new box culvert on WIS 22 in the town of Washington.
October 5 to October 9: Crews will place heavy riprap around bridge walls and grade the slopes around the bridge. If weather is favorable, they will install waterproofing to the top slab of the bridge.
Traffic Impacts: WIS 22 will be closed to traffic between Lakeview Drive and Oakcrest Drive for the duration of the project. Residents and businesses will be able to access their property. A detour will be posted via WIS 117, WIS 29, and WIS 47/55.
Website: http://projects.511wi.gov/wis22-culverts/
Highway: WIS 47/55
Location: Shawano Creek to Menominee County Line
Project ID: 6243-00-64/08-70
Schedule: June 22, 2020 to September 2020
Cost: $4,176,346.71
Length of project: 5 miles
Project description: Resurface the highway and widen paved shoulders. Modify the intersections with County H, Maple Avenue, Frailing Lane, and County A to improve traffic operations. Replace pavement at the railroad crossing and install new signals and gates. Reconstruct curb ramps to meet current ADA requirements and spot repair of curb and gutter. Rehabilitate the surface on the bridge over Shawano Creek.
October 5 to October 9: Crews will be on site working on punch list items. Railroad crews will be working around the rail crossing.
Traffic impacts: Flagging operations at various locations throughout the project. Old Keshena road is closed at WIS 47. From October 5 to October 8, shoulder and lane closures around the railroad crossing with a maximum width of 12 feet. Crews anticipate a full closure for railroad work with a signed detour using WIS 29, US 45, and WIS 47 beginning the week of October 12. The closure is expected to be a maximum of one week.
Website: https://projects.511wi.gov/wis47shawano/
Vilas County
Highway: WIS 70
Location: WIS 70, east of St. Germain to Eagle River, County O to County H
Project ID: 9080-14-61/73
Schedule: August 24, 2020, estimated completion in late October 2020
Cost: $1,999,318
Length of project: 7.06 miles
Project description: Crews will be replacing culvert pipes and guard rail on the project. Crews will also be resurfacing the WIS 70 asphalt pavement and performing other work including: grading, base aggregate dense, epoxy pavement marking, and centerline rumble strips.
October 5 to October 9: The contractor plans to continue milling and paving WIS 70 mainline. They will also pave intersections once the mainline has been completed. Temporary and permanent centerline pavement marking will be installed that corresponds with the milled/paved portion of the project at the end of each day. The contractor will also start removing guardrail and grading for new guardrail at the end of next week.
Traffic Impacts: WIS 70 construction will continue. Motorists can expect single lane closures with flagging during weekday daylight hours. Traffic will be open to two lanes of traffic at all other times.
Highway: WIS 70
Location: US 51 to WIS 155
Project ID: 9080-14-74
Schedule: August 24, 2020 to October 20, 2020
Cost: $2,524,353
Length of project: 10.57 miles
Description: This is a resurfacing project consisting of culvert replacement, curb and gutter, sidewalk, concrete driveway, concrete sidewalk, milling, asphalt paving, gravel shoulders, beam guard and pavement markings.
October 5 to October 9: Crews will be landscaping finished slopes, milling and paving, shoulder work, and apply pavement markings.
Traffic Impacts: Traffic will be directed with a single lane flagging operation at various locations throughout the work zone. Motorists should expect minor delays.
Waupaca County
Highway: WIS 22
Location: WIS 110 South to WIS 54 East/South Branch Little Wolf River
Schedule: August 21, 2020 to October 2020
Project ID: 6220-00-72
Cost: $630,000
Length of project: 2.4 miles
Description: Crews will be removing and paving asphalt on WIS 22/WIS 54/WIS 110 from County KK to east of WIS 22/WIS 110 and milling and repaving asphalt on WIS 22/WIS 110 from WIS 54 to the bridge over the South Branch of the Little Wolf River.
October 5 to October 9: Crews will continue working on punch list items.
Traffic impacts: WIS 22/54/110 will be restricted to one lane in each direction during flagging operations from County KK to Cardinal Lane.
Highway: WIS 49
Location: Village of Iola, Bridge over the South Branch of the Little Wolf River
Project ID: 6270-00-74
Schedule: July 27, 2020 to October 2020
Cost: $671,000
Description: The bridge over the South Branch of the Little Wolf River will be reconstructed.
October 5 to October 9: Crews anticipate completion of concrete and asphalt work.
Traffic Impacts: WIS 49 is closed from Depot Street to Mill Street. Vehicle and Pedestrian detour:
Website: https://projects.511wi.gov/wis49-wolf-river-bridge/
For more information regarding traffic impacts, transportation news and improvement project updates in Wisconsin’s North Central region: